These Documents are in Acrobat PDF format.
Application for Operation of Customer-Owned Generation:
This application asks the engineering and equipment specifications of the generation unit you plan to connect to Glacier Electric's distribution grid. It is used for both large and small generators of all types. It also addresses safety aspects of generators that will not be connected to the grid, such as standby applications.

Consumer Guidelines for Electric Power Generator Installation and Interconnection:
This section contains the requirements regarding size and safety aspects of the generator you are connecting to our system. This section applies only to 30 kW and smaller units. Different, more complex guidelines, are used for 30 kW and larger generators.

Glacier Electric Distribution Cooperative Agreement for Interconnection of Distributed Generation:
This is the actual legal contract and agreement you will be required to complete before you will be able to connect our system.

 


These Documents are in Microsoft Word format.
Application for Operation of Customer-Owned Generation:
This application asks the engineering and equipment specifications of the generation unit you plan to connect to Glacier Electric's distribution grid. It is used for both large and small generators of all types. It also addresses safety aspects of generators that will not be connected to the grid, such as standby applications.

Consumer Guidelines for Electric Power Generator Installation and Interconnection:
This section contains the requirements regarding size and safety aspects of the generator you are connecting to our system. This section applies only to 30 kW and smaller units. Different, more complex guidelines, are used for 30 kW and larger generators.

Glacier Electric Distribution Cooperative Agreement for Interconnection of Distributed Generation:
This is the actual legal contract and agreement you will be required to complete before you will be able to connect our system.